Light RainNow
16 °C
61 °F
Chance of RainFri
17 °C
62 °F
Chance of RainSat
21 °C
69 °F
Chance of RainSun
19 °C
66 °F
90_mini
Send Us A News Tip

Monday November 21st, 2011

Posted at 3:15pm

Print Friendly

Closed since before the last Red Bull Air Races were in town, Windsor’s riverfront is now entirely open from end-to-end.

As part of a series of Federal Infrastructure Projects, a stormwater retention treatment basin was installed under an existing parking lot East of the Riverfront Festival Plaza.

Work crews also took the opportunity to redo sections of trail between the Basin and the Bert Weeks Memorial Fountain.

The entrance to a revamped parking lot on top of the Waterfront Retention Treatment Basin

Windsor's new downtown beach

Do You Like This Article?