NEWS >
CloudyNow
3 °C
37 °F
Periods Of Rain Or DrizzleSun
3 °C
37 °F
Periods Of Rain Or DrizzleMon
10 °C
50 °F
Chance Of ShowersTue
5 °C
41 °F

Windsor Essex Christmas Events Guide

Local Events

Traffic Cameras

Daily NEWS-LETTER

Sign Up Here

Lowest Gas Prices

Cross Removed From Hotel Dieu Early Amid Safety Concerns

Friday September 27th, 2013, 12:23pm

0
0

Hello time traveller!!
This article is 4097 days old.
The information listed below is likely outdated and has been preserved for archival purposes.

A large iron cross on the front of Hotel-Dieu Hospital was removed early this morning amid safety concerns as the hospital transitions from ‘faith based’ to secular.

Hotel-Dieu’s Steve Erwin says the decision was made to take the cross down early due to heavy deterioration. “It was a safety concern near a main entrance for patients and visitors.”

The cross removal was originally scheduled to take place during a ceremony held this morning at 11am.

The building is transitioning from ‘faith based’ to secular as the Hospital moves to the Tayfour campus, and Windsor regional Hospital assumes the Ouellette Avenue site.

Hotel-Dieu’s Chapel will be decommissioned on Monday September 30th. Bishop Ronald Fabbro will celebrate the last Mass and decommission the Chapel at that time.

Windsor Regional officially takes over Hotel Dieu site on October 1st.

windsoriteDOTca
Daily Newsletter

Sign up to receive all the latest, local news stories you may have missed!

We don’t spam! Read our privacy policy for more info.

Do You Like This Article?

Content Continues Below Local Sponsor Message
Content Continues Below Local Sponsor Message
Content Continues Below Local Sponsor Message