Light RainNow
11 °C
51 °F
ShowersFri
15 °C
59 °F
Mainly CloudySat
11 °C
52 °F
A Mix Of Sun And CloudSun
14 °C
57 °F

Things To Do In
Windsor Essex

Follow Us On
TikTok

Traffic Cameras

Daily NEWS-LETTER

Sign Up Here

Lowest Gas Prices

Road Construction You Should Know About This Week

Sunday September 11th, 2016, 4:00pm

0
0

Hello time traveller!!
This article is 2777 days old.
The information listed below is likely outdated and has been preserved for archival purposes.

A number of new road construction projects get underway in the city this week.  Each Sunday we will provide an updated list of the current projects underway and their expected completion dates.

New This Week:

Wyandotte Street East:
From Cadillac Street to Arthur Road will be reduced to one lane in each direction until September 13th.

Norman Road:
From Adstoll Avenue to Joinville Avenue will be closed for paving until September 13th.

Hall Avenue:
Will be closed from Hanna Street East to Tecumseh Road East for water main construction and road rehabilitation until December 16th.

Hanna Street East:
Will be closed from Pierre Avenue to Moy Avenue for water main construction and road rehabilitation until December 16th.

Moy Avenue:
From Tecumseh Road East northerly to 1835 and 1832 Moy Avenue will be restricted to local traffic and emergency vehicles only for storm and sanitary sewer relining until December 31st.

Stratford Court:
From Mount Carmel Drive to the dead end will be restricted to local traffic and emergency vehicles only for storm and sanitary sewer relining until December 31st.

Everts Avenue:
From Norfolk Street to the dead end will be restricted to local traffic and emergency vehicles only for storm and sanitary sewer relining until December 31st.

Villa Maria Boulevard:
South to Villa Maria Boulevard North through the easement crossing Churchill Drive and Eden Drive will be restricted to local traffic and emergency vehicles only, for storm and sanitary sewer relining until December 31st.

Churchill Drive:
From Villa Maria Boulevard North to Eden Drive will be restricted to local traffic and emergency vehicles only for storm and sanitary sewer relining until December 31st.

Eden Drive:
From Villa Maria Boulevard South to Churchill Drive will be restricted to local traffic and emergency vehicles only for storm and sanitary sewer relining until December 31st.

South National Street:
From Ellrose Avenue to Norman Road will be restricted to local traffic and emergency vehicles only for storm and sanitary sewer relining until December 31st.

Moy Avenue:

From Giles Boulevard East to Erie Street East will be restricted to local traffic and emergency vehicles only for storm and sanitary sewer relining until December 31st.

Langlois Avenue:
From Tecumseh Road East northerly to 1691 and 1682 Langlois Avenue will be restricted to local traffic and emergency vehicles only for storm and sanitary sewer relining until December 31st.

On Going:

Howard Avenue:
From Hyde Street to the ETR tracks will be restricted to one lane in each direction for road resurfacing until September 16th.

Riverside Drive East:

From Dieppe Street to Solidarity Tower will be restricted to one lane for hydro pole relocation on the north side of Riverside Drive East. Flag people will be on site until December 20th.

Meldrum Road:

Between Tecumseh Road East and Ypres Avenue, will be closed for sewer and road reconstruction until December 9th.

Turner Road:
Will be closed from Sydney Avenue to Seymour Boulevard for water main construction and road rehabilitation until October 28th.

Woodward Boulevard:
Will be closed from Seymour Boulevard to Foster Avenue for water main construction and road rehabilitation until October 28th.

Wahketa Street:
Will be closed from Bruce Avenue to Dougall Avenue for water main construction until December 16th.

York Street:
Will be closed from Wahketa Street to CPR tracks, south of Wear Street, for water main construction until December 16th.

Church Street:

Will be closed from Wahketa Street to Tecumseh Road West for water main construction until December 16th.

Wear Street:
Will be closed from York Street to Church Street for water main construction until December 16th.

Langlois Avenue:
Will be closed from Shepherd Street East to Tecumseh Road East for water main construction until December 16th.

Randolph Avenue:
Will be closed from Tecumseh Road West to Algonquin for road reconstruction until September 16th.

St. John Street:
From Clairview Street to Menard Street will experience traffic restrictions for sewer, water main and road reconstruction until October 31st.

E.C. Row Expressway:
Lane restrictions will take place in the westbound lanes between Central Avenue and Walker Road as part of the bridge repair project at the CNR and Walker Road structures until October 28th.

Marentette, Vimy and Lens Avenues:
Will have traffic restrictions in place for sewer, watermain and road rehabilitation until December 16th.

windsoriteDOTca
Daily Newsletter

Sign up to receive all the latest, local news stories you may have missed!

We don’t spam! Read our privacy policy for more info.

Do You Like This Article?

Content Continues Below Local Sponsor Message
Content Continues Below Local Sponsor Message
Content Continues Below Local Sponsor Message