UPDATED: Fire At Chrysler Assembly Plant

Saturday February 28th, 2015

Posted at 6:18pm

0
0
0
Print Friendly, PDF & Email

Hello time traveller!!

This article is 1239 days old.

The information listed below is likely outdated and has been preserved for archival purposes.

(null)

Last updated: Sunday March 8th, 8:25am

Windsor firefighters have put out a small blaze at Chrysler’s Windsor Assembly Plant.

Crews were called to the plant’s Gate 4 around 5:30pm for a report of smoke in the plant in the area of the ceiling and roof.

Firefighters pulled apart areas of the roof to fight the blaze which was contained to an area of roughly 8 meters.

By 7pm the fire had been extinguished.

The cause was accidental ignition.

Police blocked traffic on Chrysler Centre between Grand Marais and Somme.

No injuries are reported.

Do You Like This Article?