NEWS >
Light SnowNow
-5 °C
24 °F
Chance Of FlurriesSun
-2 °C
28 °F
Chance Of Flurries Or Rain ShowersMon
3 °C
37 °F
A Mix Of Sun And CloudTue
2 °C
36 °F

Windsor Essex Christmas Events Guide

Local Events

Traffic Cameras

Daily NEWS-LETTER

Sign Up Here

Lowest Gas Prices

Crumbling Portion of Baseline Road Repaved

Friday May 4th, 2012, 1:15pm

0
0

Hello time traveller!!
This article is 4594 days old.
The information listed below is likely outdated and has been preserved for archival purposes.

A long and popular stretch road near the Windsor Airport was freshly repaved last week.

Baseline Road near Windsor Airport (in the Sandwich South area) from County Road 42 to the Eighth Concession was repaved after the busy shortcut from Windsor to Tecumseh had deteriorated.

Coco Paving repaved the stretch of roadway at a cost of $536,047.50 (a cost shared with Legacy Park Drive nearby).

windsoriteDOTca
Daily Newsletter

Sign up to receive all the latest, local news stories you may have missed!

We don’t spam! Read our privacy policy for more info.

Do You Like This Article?

Content Continues Below Local Sponsor Message
Content Continues Below Local Sponsor Message
Content Continues Below Local Sponsor Message