FogNow
19 °C
66 °F
Partly CloudySun
31 °C
87 °F
ClearMon
33 °C
92 °F
Partly CloudyTue
28 °C
82 °F
Send Us A News Tip

Friday December 19th, 2014

Posted at 8:54pm

Print Friendly, PDF & Email

Hello time traveller!

This article is 1254 days old.

The information listed below is likely outdated and has been preserved for achival purposes.

Click for larger map

More changes are coming this weekend for drivers who use Highway 3/Huron Church

Two lanes of Highway 3 eastbound south of E.C. Row Expressway have now shifted onto the new permanent alignment between Labelle Street and the Lambton Road/Grand Marais Road West intersections.

As part of this shift, the Bethlehem Avenue intersection will partially open to traffic in a “right-in/right-out” configuration.

Left-hand turns to Highway 3 westbound will not be permitted.

Residents from the Spring Garden/Bethlehem areas will now have access to Highway 3 eastbound (Huron Church Road southbound).

The left-hand turn lane from Highway 3 eastbound to Labelle Street and the left-hand turn lane from Labelle Street to Highway 3 eastbound will be closed.  Parents and school staff who normally access Highway 3 eastbound at Labelle Street are asked to find alternate routes for access. These lane closures are anticipated to be in effect for a minimum of two months.

Portions of the permanent Parkway opening as part of this shift include parts of two new intersections and the eastbound Highway 3 overpass (Bridge 7). The top of the Labelle Tunnel (T-2) carries the Bethlehem/Highway 3 intersection (Highway 3 eastbound) and a portion of the Labelle/Highway 3 intersection (Highway 3 westbound). Both intersections will be connected over the Labelle Tunnel once this section is complete.

Do You Like This Article?