ClearNow
5 °C
41 °F
Partly CloudyTue
20 °C
68 °F
ClearWed
19 °C
67 °F
ClearThu
21 °C
70 °F
Send Us A News Tip

Tuesday April 24th, 2012

Posted at 10:15am

Print Friendly, PDF & Email

Workers from Facca Construction have finished building a “three-cell box-culvert” to support the Parkway’s new service road and Huron Church Diversion over the Grand Marais Drain.

Construction of the all-concrete structure started in the Winter and a roadway to be built above it will connect two road “diversions” — or new portions of Huron Church — while the old road is decommissioned to build two tunnels.

Road diversions along Highway 3 and Huron Church are expected to open in early summer.

Do You Like This Article?